Unscrew cap from cryostat-section of transfer tube
Insert cryostat-section into cryostat port all the way, screw down o-ring connector onto port
Screw cap onto cryostat-section. (Starting with it open allows He to purge the air out of the tube.)
Make sure that Dewar-section has thin extender tube screwed tightly to the end and has two knurled brass connectors somewhere in the middle of the tube. Also it should have a paper binder clip.
Remove knurled knob from top of Dewar. Close blue and red Dewar valves.
Open yellow Dewar valve (top port) and lower Dewar-section of transfer tube into Dewar. This can be done by one person with the upper section resting on the top of the cryostat. Lower it until gas starts coming through or until it is close to the bottom, whichever comes first, and screw knurled knob onto Dewar port.
He gas should start coming out of the end of the Dewar-section faster and faster. If the Dewar is half empty you may need to accelerate the process by applying He pressure to the Dewar from the wall supply through the side port (blue valve).
When a plume comes out of the end of the Dewar-section, quickly unscrew the cap on the cryostat-section, insert the Dewar-section end into the cryostat-section, and quickly screw the connection tight.
Update log book with time, bath level, recovery meter reading, amount in Dewar (if known)
At this point the procedure is the same as with the old tube: lower tube into Dewar until it is 2 inches from bottom, apply pressure from wall supply, throttle pressure with blue valve on Dewar to maintain an approximate fill rate of 1%/minute.
Wait until the bath reaches 90% or when it stops rising (because Dewar is nearly empty)
Stop pressurizing Dewar. Let pressure out through red valve.
Pull Dewar-section up so that the bottom is well above the level in the Dewar
Disconnect the two sections then screw the cap onto the cryostat-section
Pull Dewar section completely out of Dewar and close yellow valve on top port
Update log book with time, bath level, recovery meter reading, amount in Dewar (if known)
Remove cryostat-section from cryostat and plug port with stopper. (Probably it is best to unscrew cap before removal.)
If Dewar is not empty reconnect side port to recovery (through blue valve). Close other two valves.
If Dewar mostly empty weigh it and return it to recovery station in the hall