| 0857 | MC at 77.8 K and flat. Turbo pump gauge on IVC reads 1e-8 mbar. After closing valve to pump, gauge reads 1.6 e-8 mbar |
| 0915 | Dump pressure 807.9 mbar at G2 |
| 0925 | Calibrated leak checker |
| 0930 | Leak checking IVC (turbo pump isolated). Background rate is 5.8e-9 mbar*l/s |
| 0935 | Background rate has settled down to 4.9e-9 mbar*l/s |
| 1115 | Complete LN2 blowout. Leak rate unchanged from 4.9e-9 mbar*l/s. |
| 1140 | Pump and flush the main bath. With pumping out the main bath, the leak rate rose slowly to ~2E-8 mbarL/s and then slowly dropped back down as the pumping was completed. While the main bath was flush with He gas, the leak rate did not change from 4.9E-9 mbarL/s. Fill LN2 cold traps full. |
| 1200 | Commence cryocleaning mixture through LN2 cold trap 2. Cease pumping on IVC. Add 4.6E-2 mbar of He exchange gas to IVC. Isolate IVC. |
| 1325 | Throughput test performed at 77 K gives a flow rate of 48 mbar/min. |
| 1330 | Start LHe transfer (0.0%). |
| 1630 | Finish LHe transfer (91.6%). |
| 1730 | Mixing chamber temperature <10 K. Commence pumping exchange gas out of IVC overnight. |
| 2230 | Fill N2 cold trap full. |
| 2235 | Interrupt cryocleaning and pump mixture into dump. |
| 2300 | Pressure in dump 818 mbar. Cease recovering mixture. Isolate dump. |