UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20160518

2016/05/18 (Wednesday)

Previous Day

Status: Fridge warming. Mixture from dump was let into fridge yesterday to facilitate warming. V14, Still gate valve, and Condenser speedivalve open. V9 is closed so some mix is isolated in the 3He pump.
0910 Tower (Cernox) = 273 K. Rising at about 0.7 K / hour
Open V1 to monitor pressure in fridge. G1 (condenser) = 652 mbar
0945 Pump mix back to dump (3He pump on, valves open are Condenser, Still, V1, V3, V5, V9).
1000 Check pressure in IVC. First pump out lines with scroll pump to 0.016 mbar, then isolate pump and open valves to IVC: IVC = 0.63 mbar.
1100 G1 (condenser) is pumped down to 1 mbar, P1 (still) pumped down to 0.12 mbar. G2 (dump) = 780 mbar. Close all valves and turn off 3He pump.
Resistance from QET biases to ground [kΩ] at 273K
PA PB PC PD
DIB1 2.1 0.6 0.5 0.5
DIB2 0.055 0.5 0.5 0.5
DIB3 0.4 0.5 0.5 0.5
1230 Enter clean room with SD crystal (USD1) to peform detector-level electrical checkout:
Detector USD1 DIB 1
date/who: 2015-05-18 DS AK
+lead - lead signal typical measured
1 2 QET A 100 to 200 Ω open
3 4 QET B 100 to 200 Ω open
5 6 QET C 100 to 200 Ω open
7 8 QET D 100 to 200 Ω open
9 chassis LED1 Rforward 8 to 9 MΩ open
9 chassis LED1 Vforward 1.0 to 1.1 V -
chassis 9 LED1 Rreverse <1 nS <0.2 nS
10 chassis LED2 Rforward 8 to 9 MΩ 782kΩ
10 chassis LED2 Vforward 1.0 to 1.1 V 1.061 V
chassis 10 LED2 Rreverse <1 nS <0.6 nS
11 12 Qo-Qi 33.4Ω
12 11 Qi-Qo 34.7Ω
Detector USD1 DIB 2
date/who: 2015-05-18 DS AK
+lead - lead signal typical measured
1 2 QET A 100 to 200 Ω open
3 4 QET B 100 to 200 Ω open
5 6 QET C 100 to 200 Ω open
7 8 QET D 100 to 200 Ω open
9 chassis LED1 Rforward 8 to 9 MΩ 758kΩ
9 chassis LED1 Vforward 1.0 to 1.1 V 1.059V
chassis 9 LED1 Rreverse <1 nS < 1 nS
10 chassis LED2 Rforward 8 to 9 MΩ open
10 chassis LED2 Vforward 1.0 to 1.1 V open
chassis 10 LED2 Rreverse <1 nS <0.2 nS
11 12 Qo-Qi 38.7Ω
12 11 Qi-Qo 43.2Ω
As done on May 3rd, perform the following cross-channel resistance measurements. Marked DIB1 with piece of kapton tape, so it's more easily identified.
q1 q2 q3 q4 g1 g2 chassis
q1 - 21.2 33.0 45.0 14.7 14.7 open
q2 - - 31.3 38.3 11.1 11.1 open
q3 - - - 55.1 26.0 26.0 open
q4 - - - - 38.4 38.4 open
g1 - - - - - 0.7 open
g2 - - - - - - open
resistances between four charge channels
and two ground connections on opposite side
1400 MC (Cernox) = 275.8 K. IVC = 0.74 mbar.
1425 Add several tube lengths to He exchange gas to IVC (< 1 inHg).
1555 Adding gas gave a boost to the warming, about 2 K in 20 minutes, but now it seems to be heating about as slowly as before.
1600 Tower (Cernox) = 278.1 K. That's 41 Fahrenheit, pretty warm now.

Next Day