Agenda
- Operations
- Run 63 (G132, Ge iZIP "pathfinder") in progress.
- Base temperature very good, 26 mK!
- Wiring error discovered. Four channels not working: one not connected, one is shorted to chassis (sorta worked early in the run), one was only intermittently connected, and one was fine during checkouts but doesn't show pulses now.
- Shield is up, event rate down from 148 Hz to 102 Hz
- Early evidence that small applied charge bias affects phonon channels. It may be difficult to run with a reasonable bias…
- Beginning IbIs measurements
- Haven't begun taking data yet, will want to
- measure charge collection efficiency
- measure phonon collection efficiency,
- characterize position reconstruction, fiducialization
- etc.
- Future 6“ run (1”-thick 5Q device). Detector now at UMN, needs to be wirebonded
- Constructing prototype extender-plug
- Continued K100 support through both Project and Operations - assume no SNOLAB upgrade
- exploring ideas for improvements without upgrade: float DCRCs for symmetric biasing Proposed Scheme, decrease Rshunt in SQUETs
- Processing and Analysis
- Run 62 (HV#4, Si)
- Phonon collection efficiency: latest data taken at 10, 20, 30, 70, 100 V, still need to analyze
- n,gamma coincidence, first plots
- Run 61, HV#2 (Ge)
- dP/dI variation with baseline few slides
- Run 56/Run 54
- Old/continuing items:
- Run 62 (HV#4, Si) post-mortem: two “bad” channels seem not to be wiring problems, maybe the problem is on the detector (photos)
- Run 60, 6“ detector paper - Plan to edit and publish without 5Q data
- Lab infrastructure
- DAQ and data pipe
- DAQ upgrade - discussed with Bruno about IbIs tool development
- Data storage and backup:
- Need to copy all Run 60 and some Run 61 data to SLAC
- Autoprocessing and data organization development:
- currently autoprocessing suspended, no “official” processing for Runs 60, 61, 62
- clean up database - some info missing. Consider adding additional info
- Possible plan to modify DCRCs (resistor swap) so we can increase front-end gain, improve IbIs (suggestion from Bruno)
- IF (not likely) new DCRC RevC.2 arriving from Bruce in Denver then
- missing resistors on 3 QET channels, we've ordered some