Agenda
- Operations
- Run 68: n,gamma coincidence with S101 (aka HV#4, Si HV prototype)
- Base around 35 mK. 1K Pot was very stable, now less so.
- Completed IbIs analysis to find good QET settings at 100V. A little more analysis left to do.
- First pulse data taken, 100V 13 hours w/out flashing, Am-241 spectrum seen
- subtle DCRC timing glitches have significant effect on OF quantities
- First attempts to estimate noise amplitude look worse than Run 62… will continue to investigate. May want to repeat Nick's noise study.
- Completed setup for automated running with automated bias setting and flashing (Instructions here). So far though it's less stable, losing lock often.
- Lab infrastructure
- He-3 circulation pumps
- still need to send back-up He-3 pump to Oerlikon/Leybold for service/repair
- Processing and Analysis
- Run 67 (re-run of USD1)
- starting to work on impact ionization model
- Run 65 (Si 150mm 5Q 1/2-vacuum-interface)
- 150 mm paper Posted to arXiv. Addressing NIM A reviewer comments, nothing major.
- LIPs search using Run 66 GeHV data.
- Planning work for possible publication
- Need to start Phonon Collection Efficiency paper (HV2, HV4, iZIP pathfinder)
- Run 62 (HV#4, Si)
- planning to work on low-energy calibration, in prep for Run 67
- Run 63 (Ge iZIP pathfinder)
- need to analyze Cf data
- Old/continuing items:
- exploring ideas for improvements without upgrade: sidewall sources?
- Run 62 (HV#4, Si) post-mortem: two “bad” channels seem not to be wiring problems, maybe the problem is on the detector (photos)
- Lab infrastructure
- plans to try to improve helium recovery
- add length of copper tubing to recovery line, to warm helium on the way to the meter. We have used it and it seems to do something. But no indication yet that it is improving recovery.
- maybe try to recover helium while waiting for the transfer stick to cool before hookup
- DAQ and data pipe
- DAQ upgrade - discussed with Bruno about IbIs tool development
- Data storage and backup:
- Need to copy all Run 60 and some Run 61 data to SLAC
- Autoprocessing and data organization development:
- currently autoprocessing suspended, no “official” processing for Runs 60, 61, 62
- clean up database - some info missing. Consider adding additional info
- Possible plan to modify DCRCs (resistor swap) so we can increase front-end gain, improve IbIs (suggestion from Bruno)