UMN CDMS Wiki archive
start › cdms › k100 › meetings › 20160826

Agenda

  • Operations:
    • Run 59 progress:
    • Run 59 (G106a) end game:
      • One more mu-metal shield data point
      • Let He build up in IVC over weekend, look at HV again on Monday
      • Post-mortem studies:
    • Future runs:
      • 6“ contact-free (aka vacuum interface) - hope to squeeze in short run before HV prototype…
      • HV prototype tests for project
        • Two of these by end of year
        • Expected to get the first in September (maybe around the 20th)
        • Second HV board is built so we can switch bias/readout polarity (could test this on G106a now…)
        • Mounting scheme, may not be able to access all side 2 phonon channels
  • DAQ and data pipe
    • Data storage and backup:
      • Need to copy over new Run 59 data
      • Need to set up a system for copying incoming data
      • Need to clean up vuk1/vuk2 before they are retired
    • Code education: Nick has done some work to understand randoms selection for noise calculation
  • Processing and Analysis
  • Physics
    • Low-energy NR peaks from neutron capture in Ge