Agenda
- Operations:
- Run 59 progress:
- Run 59 (G106a) end game:
- One more mu-metal shield data point
- Let He build up in IVC over weekend, look at HV again on Monday
- Post-mortem studies:
- look for leak into IVC (from bath or from dilution unit?)
- shorts in DIB2 qInner, probably broken wirebonds in side coax
- Future runs:
- 6“ contact-free (aka vacuum interface) - hope to squeeze in short run before HV prototype…
- HV prototype tests for project
- Two of these by end of year
- Expected to get the first in September (maybe around the 20th)
- Second HV board is built so we can switch bias/readout polarity (could test this on G106a now…)
- Mounting scheme, may not be able to access all side 2 phonon channels
- DAQ and data pipe
- Data storage and backup:
- Need to copy over new Run 59 data
- Need to set up a system for copying incoming data
- Need to clean up vuk1/vuk2 before they are retired
- Code education: Nick has done some work to understand randoms selection for noise calculation
- Processing and Analysis
- New Run 58 analyses(USD1) in prep for R&D meeting
- What should we plan to publish?
- Physics
- Low-energy NR peaks from neutron capture in Ge