Agenda

  • Run 69 (GeHV n,gamma NR calibration) status
    • DCRC refurb?
      • DCRC55(1) is at FNAL for Sten to test. Unknown how long it will take him.
    • PuBe source availability:
      • there is one block of a couple weeks around April when we can borrow it
      • Kevin is amenable to weekend use - it would need to be returned on Sunday for 24-hour activation before Monday classes
      • Kevin said we can use it the week before and the week of Spring Break, needed back the Monday after break. (March 9-25.)
    • Tower assembly complete.
      • Tower crown was modified on Thursday to mount three LED boards.
      • Tower assembly completed Friday; many holes covered that may have been leaking IR previously
    • We'll probably try the heat-sinking modification (previous analysis). Note: primary noise is HV-leakage-related, this is a secondary consideration. Options:
      • leave 4K heat sinks to tower disconnected
      • leave 4K shield stage off completely
      • thermally anchor tower's 4K stage to its 600 mK stage
    • Ideas about producing extra IR to test whether it affects observed charge leakage
    • Calibration source:
      • Smoke-detector Am source mounted at center of detector Side 2 (bias side), as in the last run.
      • The detector was kept in the source safe with the Cf-252 source for 2 weeks to preactivate it. (Currently source in its small poly container is with detector in purge cabinet.)
  • Run 68 (n,gamma with S101) analysis:
  • Future 150mm runs
    • 150mm w/phonons - need to design 600mK rod to accommodate 150mm cans
    • Received 4/3-inch DIBs from TAMU - now we can house either detector for phonon readout (would need to machine faces on 4/3-inch housing for DIBs)
    • S1501 and S1502 sent back to TAMU
    • We have decided we can run 8 phonon channels
      • Preferred DIB-pad layout: two DIBs separated by 120 degrees
      • Himangshu's mask design: PDF download
      • Will use existing vacuum-interface electrode, mounted on side opposite the phonon side
      • Will connect directly to two DCRCs, with one diverter board to route one tower wire to HV connection
      • We'll want LEDs - are there some mounted on the DIBs? We can mount external LEDs too - existing electrode has mounts.
    • First 150mm phonon detector will be monolithic, but “donut+hole” arrangement (active veto) proposed as well.
    • Aiming for May to finish fabrication and start run.
  • Other future runs
    • Future HVeV runs?
      • Berkeley can help us with a Soudan-style housing mount (3“ or 4”?)
      • then use original tower, can try different heatsinking for colder SQUID card
      • would need to install optical fiber
        • through top or through stripline tube? need vacuum feedthrough
        • Look at Prisca's deuterium lamp/monochromator/filters, glass UV fiber
      • Is PuBe NR calibration feasible?
        • 1×1×0.4 cm^3 is 630× smaller than SNOLAB detector. Anthony estimates 25 events/day (over full spectrum) for Si, 250 events/day for Ge. any chance we could get multiple chips?
        • Nick's idea: sandwich between two 4“ Ge detectors for gamma coincidence (large solid angle coverage)
    • Other ideas:
      • run SiHV with Nick's movable Am source (or with multiple Am sources)
      • run SiHV with no 4K heatsinking
      • re-run USD1? do we have any additional ideas to test it?
      • anything else?