Agenda
- Operations
- Run 62 (HV#4, Si) status:
- Tower finally down to 36 mK
- DCRC problems:
- DCRC3 flatline problem seems to have disappeared (but DCRCX is flatlining). So currently all three are working
- FedEx has apparently lost the RevC.1 from Denver
- SQUIDs have been retuned, all using DCRC1
- Possible plan to modify DCRCs (resistor swap) so we can increase front-end gain, improve IbIs (suggestion from Bruno)
- Future 6“ runs planning
- Processing and Analysis
- Run 61, HV#2 (Ge) analysis:
- Run 60, 6“ detector analysis
- NSOF work for G106a iZIPv6 data
- Physics
- low-energy Comptons and n,gamma calibrations with external triggering
- DAQ and data pipe
- IF new DCRC RevC.2 arriving from Bruce in Denver then
- missing resistors on 3 QET channels, we've ordered some
- DAQ upgrade - should ask Bruno about new IbIs tool
- Old/continuing items:
- Data storage and backup:
- Need to copy all Run 60 and some Run 61 data to SLAC
- Need to clean up vuk1/vuk2 before they are retired. Need to ask Angie again when she will finish copying data
- Autoprocessing and data organization development:
- currently autoprocessing suspended, no “official” processing for Runs 60, 61
- clean up database - some info missing. Consider adding additional info