Agenda

  • Operations
    • Run 62 (HV#4, Si) status:
      • Tower finally down to 36 mK
      • DCRC problems:
        • DCRC3 flatline problem seems to have disappeared (but DCRCX is flatlining). So currently all three are working
        • FedEx has apparently lost the RevC.1 from Denver
      • SQUIDs have been retuned, all using DCRC1
      • Some IbIs testing Friday, Monday
      • Possible plan to modify DCRCs (resistor swap) so we can increase front-end gain, improve IbIs (suggestion from Bruno)
    • Future 6“ runs planning
  • Processing and Analysis
  • Physics
    • low-energy Comptons and n,gamma calibrations with external triggering
  • DAQ and data pipe
    • IF new DCRC RevC.2 arriving from Bruce in Denver then
      • missing resistors on 3 QET channels, we've ordered some
    • DAQ upgrade - should ask Bruno about new IbIs tool
    • Old/continuing items:
      • Data storage and backup:
        • Need to copy all Run 60 and some Run 61 data to SLAC
        • Need to clean up vuk1/vuk2 before they are retired. Need to ask Angie again when she will finish copying data
      • Autoprocessing and data organization development:
        • currently autoprocessing suspended, no “official” processing for Runs 60, 61
        • clean up database - some info missing. Consider adding additional info