Agenda
- Operations:
- Run 59 progress:
- Mu-metal shield scans have begun
- Some confusing issues in data
- Immediate Run 59 planning:
- Coordinating Queen's visit
- Operations during Collab meeting next week (crew = David)
- Other Run 59 (G106a) goals:
- second HV attempt
- more data for position reconstruction studies - multiple Am sources in different positions
- Possibly test DCRC RevD with adapter board from UCB.
- May want to study phonon noise more.
- Future runs:
- 6“ contact-free (aka vacuum interface)
Sidewall source ?- Theoretically, Ge-iZIP prototype detector arrives from TAMU in September. Supposed to test this and Ge-HV prototype before CD2 early next year.
- DAQ and data pipe
- Data storage and backup:
- Still need to back up Run 58 to SLAC
- Need to set up a system for copying incoming data
- Need to clean up vuk1/vuk2 before they are retired
- Code education: should try to find time to continue studying this (Matt, David?, Nick?, Allison?)
- Processing and Analysis
- Run 58 (USD1): Need to follow up a bit on this
- Progress in NSOF development for reprocessing
- What should we plan to publish?
- Fridge
- Physics
- Low-energy NR peaks from neutron capture in Ge