UMN CDMS Wiki archive
start › cdms › k100 › meetings › 20170919

Agenda

  • Operations
  • Lab infrastructure
    • He-3 circulation pump is noisy
      • probably should change oil
      • may want to send it out for maintenance
      • should have our second pump fixed - it is leaky.
      • from Hassan, June 2015: “f. Repair, scrap or replace one of our existing circulation pumps. We have a leaky circulation pump that should be sent back to Leybold for repair. It leaks intermitently. Rather than repair it, we could ask Leybold to scrap it and purchase a new oil-sealed pump from them. Alternatively, we could ask them to scrap it, and purchase a new dry pump. The dry pump requires far more maintenance than the oil-sealed pump however.”
    • plans to try to improve helium recovery
      • add length of copper tubing to recovery line, to warm helium on the way to the meter. Installed.
      • maybe try to recover helium while waiting for the transfer stick to cool before hookup
  • Processing and Analysis
    • Run 63 (Ge iZIP pathfinder)
      • need to analyze bkg data (phonon collection efficiency) and Cf data
    • Run 62 (HV#4, Si)
      • n,gamma coincidence: …
    • Run 61, HV#2 (Ge)
    • Run 56/Run 54
  • Old/continuing items:
    • exploring ideas for improvements without upgrade: float DCRCs for symmetric biasing Proposed Scheme, decrease Rshunt in SQUETs (had a look at this, a little hard to set up: SQUET picture), sidewall sources?
    • Run 62 (HV#4, Si) post-mortem: two “bad” channels seem not to be wiring problems, maybe the problem is on the detector (photos)
    • Run 60, 6“ detector paper - Plan to edit and publish without 5Q data
    • Lab infrastructure
    • DAQ and data pipe
      • DAQ upgrade - discussed with Bruno about IbIs tool development
      • Data storage and backup:
        • Need to copy all Run 60 and some Run 61 data to SLAC
      • Autoprocessing and data organization development:
        • currently autoprocessing suspended, no “official” processing for Runs 60, 61, 62
        • clean up database - some info missing. Consider adding additional info
    • Possible plan to modify DCRCs (resistor swap) so we can increase front-end gain, improve IbIs (suggestion from Bruno)
    • IF (not likely) new DCRC RevC.2 arriving from Bruce in Denver then
      • missing resistors on 3 QET channels, we've ordered some