Agenda
- Operations
- Run 62 (HV#4, Si) status:
- Still only using two DCRCs, Berkeley will send us one for next run
- Tested DCRC“X” finally after return from Sten, did not flatline, so far seems OK
- Further analysis of 50V data, update on spectra, resolutions
- Noise runs: long trace randoms at varied HV, still need to be analyzed
- Planning n,gamma PuBe setup with external trigger
- Ge iZIP “pathfinder” - have proposed a bonding scheme to connect all 12 phonon channels for readout. Current ETA is three weeks min from now.
- Delay in fab because Tc samples (target 45 mK) have not been tested. Problem with diameter, may not fit in housing…
- Future 6“ run (1”-thick 5Q device)
- Continued K100 support through both Project and Operations - assume no SNOLAB upgrade
- exploring ideas for improvements without upgrade: float DCRCs for symmetric biasing, decrease Rshunt in SQUETs
- Lab infrastructure
- vuk1/vuk2 are retired
- Processing and Analysis
- Run 61, HV#2 (Ge) analysis:
- should continue to refine phonon collection efficiency estimate (original synopsis)
- Update on position reconstruction and multiple-template fitting
- Will continue HV#2 report at Friday Tower Technical Meeting
- Nick and Matt will present at first SNOLAB Analysis meeting on Friday 1pm Central
- Run 60, 6“ detector paper - Plan to edit and publish without 5Q data
- G106a iZIPv6 analysis status
- Physics
- low-energy Comptons and n,gamma calibrations with external triggering
- Old/continuing items:
- DAQ and data pipe
- DAQ upgrade - discussed with Bruno about IbIs tool development
- Data storage and backup:
- Need to copy all Run 60 and some Run 61 data to SLAC
- Autoprocessing and data organization development:
- currently autoprocessing suspended, no “official” processing for Runs 60, 61, 62
- clean up database - some info missing. Consider adding additional info
- Possible plan to modify DCRCs (resistor swap) so we can increase front-end gain, improve IbIs (suggestion from Bruno)
- IF (not likely) new DCRC RevC.2 arriving from Bruce in Denver then
- missing resistors on 3 QET channels, we've ordered some