Agenda
- Operations:
- Run 61 (HV#2) status
- Two stripline breaks/reroutings
- 77K electrical checkout shows one high-resistance SQUID, may be a problem (TES1, one of the Side 1 inner-ring sections)
- No cryo problems so far, no leaks to IVC, throughput good
- Need to set up processing for 12-phonon-no-charge, 6-phonon-no-charge
- DAQ upgrade planned
- CAEN HV supply still needs to be set up for remote control, automation
- Run 61 planning…Draft Testing Plan
- DAQ and data pipe
- Data storage and backup:
- Need to copy Run 60 data to SLAC
- Need to clean up vuk1/vuk2 before they are retired. Spoke with Angie, she said she can copy what she needs
- Autoprocessing and data organization development:
- should work on implementing smart processing so that data with different configurations can be processed automatically
- should add more info to database, particularly since outside analysis manpower (TAMU, Noah) will be joining our analysis crew
- does it make sense for outside manpower to help with this stuff?
- Processing and Analysis
- Run 60, 6“ detector, analysis
- Further investigation of charge pulse glitches
- Alternative amplitude algorithms if OF doesn't work
- need to get back to work on NSOF, should test whether resolution is improved with new filtering
- Then work on reprocessing old data
- Physics
- Low-energy NR peaks from neutron capture in Ge