UMN CDMS Wiki archive
start › cdms › k100 › meetings › 20160722

Agenda

  • Operations:
    • Run 59 progress:
    • Other Run 59 (G106a) goals:
      • second HV attempt
      • more data for position reconstruction studies - multiple Am sources in different positions
      • Possibly test DCRC RevD with adapter board from UCB.
      • May want to study phonon noise more.
    • Future runs:
      • 6“ contact-free (aka vacuum interface)
      • Queen's visit next week during Run 59
      • Sidewall source ?
      • Theoretically, Ge-iZIP prototype detector arrives from TAMU in September. Supposed to test this and Ge-HV prototype before CD2 early next year.
    • HPGe configuration (purpose is for neutron capture/recoil study, want to trigger iZIP on HPGe gammas)
  • DAQ and data pipe
    • Data storage and backup:
      • Still need to back up Run 58 to SLAC
      • Need to set up a system for copying incoming data
      • Need to clean up vuk1/vuk2 before they are retired
    • Code education: should try to find time to continue studying this (Matt, David?, Nick?, Allison?)
  • Processing and Analysis
    • Run 58 (USD1): Need to follow up a bit on this
    • Progress in NSOF development for reprocessing
    • What should we plan to publish?
  • Fridge
  • Physics
    • Low-energy NR peaks from neutron capture in Ge