Agenda
- Operations:
- Run 56 (the current run): Run 56 Summary
- finishing photoneutron (Y-Be) data taking
- finishing run: mu-metal shield tests, data with no lead/poly shield
- Next run: probably G114 (the other iZIPv6) for HV attempt, maybe other studies, no internal source
- Note from Paul B: this is the first AJA detector, and there are some concerns re “step coverage” and continuity. If Rn's are found to be too high (say, >1.5 Ω) then we should probably immediately deem this detector “bad” in terms of phonons at least. Could still try to test HV characteristics with charge only.
- Future runs: 6“ crystals, SD crystal, sidewall source, G106a with no-internal-source
- DAQ and data pipe:
- Moving DAQ to run on cdms2
- Read rate studies: cdms2 versus jiajin; one DCRC versus three DCRCs
- Analysis: updates and planning