| Teleconference link: | https://umn.zoom.us/j/8797896096 or https://umn.zoom.us/my/fritts |
| Access code: | 879-789-6096 |
Agenda
- Planning Run 72
- Ge HV detector (G101“d”) almost ready, Side 2 channels etched off at TAMU, may get shipped on Monday
- was able to etch without any damage to Side 1 (half-dipped)
- Wirebonding miscommunication - Mark wirebonded three of the six Side1 channels to the wrong DIB pads
- He offered to fix this but said it could fail because some pads are mostly covered with stubs
- If he leaves it as is we can't use the HV board, but we could run with 3 DCRCs (instead of only 2 with board)
- Nick says in 3DCRC mode we can still pretty easily connect HV
- Currently planning to leave bonding as is and go this route for this run
- Plan movable source in Position 1, detector Position 2, electrode Position 3. Use CDMS2 p4-length side coaxes, these seem OK
- Movable source prep - add epoxied wiring heatsinks
- No news on S104 mounting/bonding at SLAC
- Budget overage: we have something like $20,000 we could spend on lab stuff before April 1
- Buy equipment/supplies:
- Replacement forepump for leak detector
- Send out spare circulation pump for leakcheck/repair
- Replace old lab computers
- Prisca says there's money in the next budget specifically for computers, so don't upgrade everything now. Maybe do a few.
- Two machines in the lab are particularly old. Got recommendations from Chad ~$200
- NbTi cables for tower-free detector&cold electronics mounting
- could get 2@25-wire for 4K-CP, 2@25-wire for CP-MC. And maybe 2@25-wire, longer, to try 4K-MC (colder SQUETs)
- SQUIDs for new cold electronics
- Copper-clad NbTi bell wire for a new source mover motor - quote at $930 for one motor
- Run 71 complete. To do:
- Some measurements of source holder for simulation purposes
- Analysis status:
- Run 71
- Paper draft - seeking comments, due today
- Run 68 (n,gamma with S101)
- Migdal analysis pending
- New (n,γ) simulations, modified signal shape
- Run 70
- analysis team includes Pramod, Matt, Zach - should coordinate, have meetings
- Need to look at the recent PuBe data, work on a low-threshold energy quantity, see if we can see a hint of (n,γ) signal. Also develop cuts and look for low-energy junk
- Will study the activation peak background
- Run 67 (USD detector with novel time-dependent gain)
- Dongming has characterized lots of microscopic processes, wants us to write a paper
- Matt working on rough model of detector behavior
- SiHV event reconstruction
- Derek working on this
- Hongguang developing connection to DMC
- Future runs?
- Re-run USD1?
- use Co source
- experiment with varying the amount of shield, distance of Ba source, see how background rate affects time variations in gain
- maybe use source mover
- Position reconstruction with source mover
- improve motor heatsinking?
- run with GeHV prototype - would probably want to rebond it for standard direct contact biasing
- some day get a SiHV prototype again, run with that
- Improved neutron calibration runs
- under discussion with Anthony - working on grant proposal for new measurements with more NaI and whatever other improvements
- more NaI coincidence detectors
- can we improve Ge?
- try again with standard bias, maybe no-tower setup?? Would this improve it?
- try polishing bias side for “true” vacuum interface?
- or - use a HVeV detector? can we get a high enough signal rate?
- or should we re-do SiHV? with one of the new “pathfinder” detectors, whichever they give to us
- Future 150mm runs
- 150mm w/phonons - we considered designing new 600mK rod to accommodate 150mm cans. Could rethink this in terms of no-tower setup maybe…
- We have 4/3-inch DIBs from TAMU - now we can house either detector for phonon readout (would need to machine faces on 4/3-inch housing for DIBs)
- S1501 and S1502 sent back to TAMU
- We have decided we can run 8 phonon channels
- Preferred DIB-pad layout: two DIBs separated by 120 degrees
- Himangshu's mask design: PDF download
- Will use existing vacuum-interface electrode, mounted on side opposite the phonon side
- Will connect directly to two DCRCs, with one diverter board to route one tower wire to HV connection
- We'll want LEDs - are there some mounted on the DIBs? We can mount external LEDs too - existing electrode has mounts.
- First 150mm phonon detector will be monolithic, but “donut+hole” arrangement (active veto) proposed as well.
- Last discussion of this was a year ago, we were aiming for May 2019 to fab a detector
- Future HVeV runs?
- Berkeley can help us with a Soudan-style housing mount (3“ or 4”?)
- then use original tower, can try different heatsinking for colder SQUID card
- would need to install optical fiber
- through top or through stripline tube?
- Should we design and build new cold hardware?
- Soudan towers didn’t perform thermally as well as they should have (graphite tubes too conductive)
- Soudan towers had requirements we can relax
- FET heat not a consideration for phonon-only devices
- Materials don’t need to be as radiopure
- Soudan tower concept
- NEXUS setup
- NbTi cable thermal conductance: G=3.11e-8*T^1.19 W/mK (for 1m, 40 wires, base = 100 mK)
- Tekdata NbTi, MDM-25 quote: ~$715 each
- Cheap ($10/inch^2) SC flex PCB inside MC can Photo
- SQUET recall
- Martin wants 5 of our 9 SQUETs sent back to Colorado. He wants good SQUIDs.
- A lot of issues to deal with:
- there are bad SQUID chips
- we need to change shunt resistances for iZIPv6 versus HV, but don't want to wirebond too many times
- some SQUETs have problems at the pins
- can we get spare SQUETs with the SQUID chips removed? Could theoretically glue good SQUID chips onto good SQUET.
- Anthony says we may be able to get alternative SQUID chips
- We have 1.5-ish months to deal with this
- Lab and infrastructure
- Leak detector: After pump rebuild, pump no longer turned. Jake and Derek fixed this problem. However, it still doesn't seem to be able to pull a good vacuum. Using scroll pump assist in order to use leak detector.