Agenda
- Operations:
- Run 60, 6“ detector test
- Bias sweep data (seagull)
- 122 keV peak from 57Co source
- Microphonic noise issues (noise PSDs)
- DCRC problems, setting thresholds for charge triggering doesn't seem to always work correctly (two signal modes?)
- Run is about to end…
- Next run: first HV prototype test
- HV#2 (G101c) is due to arrive ~Tuesday. Would like fridge to be at room temperature Monday morning.
- Wirebonding scheme, may not be able to access all side 2 phonon channels
- Preparations:
- Need to set up processing for 12-phonon-no-charge, 6-phonon-no-charge
- CAEN HV supply (from Soudan vetoshield) - hopefully can set up for automatic HV setting
- DAQ and data pipe
- Data storage and backup:
- Need to copy new raw data to SLAC
- Need to clean up vuk1/vuk2 before they are retired. Emailed Angie over a week ago, no response yet
- Autoprocessing and data organization development:
- should work on implementing smart processing so that data with different configurations can be processed automatically
- should add more info to database, particularly since outside analysis manpower (TAMU, Noah) will be joining our analysis crew
- does it make sense for outside manpower to help with this stuff?
- Processing and Analysis
- work on NSOF, should test whether resolution is improved with new filtering
- Then work on reprocessing old data
- Physics
- Low-energy NR peaks from neutron capture in Ge
- have done some tests with the 1 Ci PuBe source in lab, looking for capture gammas with NaI and HPGe