Agenda
- Operations:
- Run 60, 6“ detector test
- Underdamped oscillations in pulse shapes, reduced effect with 30 kΩ resistor added to feedback line (noise comparison)
- 60 keV peak seen
- so far analysis depends on pulse height quantities Examples Here
- should try to produce template and do OF processing First pass here
- Tests of flashing and hold time
- Bias sweeps: No seagull effect yet seen for +/-9V to +/-12V
- Next run: first HV prototype test
- Current ETA is end of September. Presumably being wirebonded at SLAC now
- Should finish Run 60 by end of next week
- Wirebonding scheme, may not be able to access all side 2 phonon channels
- Should prepare processing for HV prototype data
- DAQ and data pipe
- Data storage and backup:
- Need to set up a system for copying incoming data to SLAC
- Need to clean up vuk1/vuk2 before they are retired. Emailed Angie over a week ago, no response yet
- Autoprocessing and data organization development:
- should work on implementing smart processing so that data with different configurations can be processed automatically
- should add more info to database, particularly since outside analysis manpower (TAMU, Noah) will be joining our analysis crew
- does it make sense for outside manpower to help with this stuff?
- Processing and Analysis
- work on NSOF, should test whether resolution is improved with new filtering
- Then work on reprocessing old data
- Physics
- Low-energy NR peaks from neutron capture in Ge
- setting up for weekend test, 1 Cu PuBe source in lab, NaI detector to look for gammas from n-capture on Si