Agenda

  • Operations:
    • Run 60, 6“ detector test
    • Next run: first HV prototype test
      • Current ETA is end of September. Presumably being wirebonded at SLAC now
      • Should finish Run 60 by end of next week
      • Wirebonding scheme, may not be able to access all side 2 phonon channels
      • Should prepare processing for HV prototype data
  • DAQ and data pipe
    • Data storage and backup:
      • Need to set up a system for copying incoming data to SLAC
      • Need to clean up vuk1/vuk2 before they are retired. Emailed Angie over a week ago, no response yet
    • Autoprocessing and data organization development:
      • should work on implementing smart processing so that data with different configurations can be processed automatically
      • should add more info to database, particularly since outside analysis manpower (TAMU, Noah) will be joining our analysis crew
      • does it make sense for outside manpower to help with this stuff?
  • Processing and Analysis
    • work on NSOF, should test whether resolution is improved with new filtering
    • Then work on reprocessing old data
  • Physics
    • Low-energy NR peaks from neutron capture in Ge
      • setting up for weekend test, 1 Cu PuBe source in lab, NaI detector to look for gammas from n-capture on Si