Agenda
- Operations:
- Run 59 progress:
- Change in charge behavior during series and possible explanation
- Run 59 (G106a) tasks:
- complete mu-metal shield tests
- second HV attempt
- more data for position reconstruction studies - multiple Am sources in different positions
- Possibly test DCRC RevD with adapter board from UCB.
- May want to study phonon noise more.
- Future runs:
- 6“ contact-free (aka vacuum interface) - scheduling will be challenging
Sidewall source ?- Theoretically, Ge-HV prototype detector arrives from SLAC in September. Supposed to test this and Ge-iZIP prototype before CD2 early next year.
- DAQ and data pipe
- Data storage and backup:
- Still need to back up Run 58 to SLAC
- Need to set up a system for copying incoming data
- Need to clean up vuk1/vuk2 before they are retired
- Code education: Nick and Allison are learning about processing code. Matt&David should work on this too
- Processing and Analysis
- Run 58 (USD1): Need to follow up a bit on this
- What should we plan to publish?
- Things not working…
- Seems to be a leak from IVC to bath. Builds up over time - maybe can deal with this by warming to 4K and pumping out periodically
- One bad charge channel, could be a significant problem
- Physics
- Low-energy NR peaks from neutron capture in Ge