Agenda
- Operations:
- Run 59 (G106a) plan:
- second HV attempt
- phonon collection efficiency versus mu-metal shield height. (Scheduled to report on this July 22)
- more data for position reconstruction studies - multiple Am sources in different positions
- Possibly test DCRC RevD with adapter board from UCB.
- May want to study phonon noise more.
- Run 59 prep:
- electrically things look OK
- found fridge blockage at 77 K on Saturday. Warmed up till it was gone then cooled again - another blockage on Thursday. Warming again….
- Future runs:
- 6“ contact-free (aka vacuum interface)
- Only 4 weeks now until the Queen's visit, if Run 59 (G106a) ever begins it will certainly still be going then
Sidewall source ?- Theoretically, Ge-iZIP prototype test in October.
- DAQ and data pipe
- Data storage and backup:
- Still need to back up Run 58 to SLAC
- Need to set up a system for copying incoming data
- Code education: should try to find time to continue studying this (Matt, David?, Nick?, Allison?)
- Processing and Analysis
- Run 58 (USD1): investigate lack of peaks, plan to compare to older data
- Progress in NSOF development for reprocessing
- What should we plan to publish?
- Physics
- Low-energy NR peaks from neutron capture in Ge