Agenda
- Operations:
- Run 57: G114 (the other iZIPv6), no internal source
- Note from Paul B: this is the first AJA detector, and there are some concerns re “step coverage” and continuity. If Rn's are found to be too high (say, >1.5 Ω) then we should probably immediately deem this detector “bad” in terms of phonons at least. Could still try to test HV characteristics with charge only.
- Elevated base temperature
- Tc and Rn
- Update on rerouting board for HV wiring
- Future runs: SD crystal, 6“ crystals, sidewall source, G106a re-run with corrected HV
- Default order is 1) SD crystal, 2) 6”, then whatever. But there may be pressure to re-run G106a sooner.
- Mounted "USD1". Got advice from Astrid for wirebonding 4Q mask.
- DAQ and data pipe
- Data storage and backup: Matt now has a SLAC user account. Waiting to hear from Tina re requested space at SLAC
- Code education - Matt, Nick, David to learn more about DAQ and processing code (Anthony is the only expert)
- Analysis
- cdmsbats audit for data analysis push (Anthony, pdf)
- updates and planning
- What should we plan to publish?