| Status | Run 74 prep. IVC is pumped out and leak-checked. Fridge and traps are pumped out. |
| 1300 | Matt enters lab |
| 1305 | Turbo on IVC = 19 nbar |
| 1305 | LN2 Dewar is empty, move it to 1st floor for Mike to fill |
| 1315 | Attend group meeting |
| 1405 | Remove covers from cryostat pit, first putting long 2by4 board through handles to prevent covers falling into pit. Still a bit awkward moving the covers for one person - fall hazard is nontrivial. |
| 1430 | Raise main bath most of the way up. |
| 1435 | Replace covers over the pit. Again I put the long board through the handles. Mostly used the board to maneuver the cover over the top of the pit, frequently walking over from the north to the south side and back to maneuver it a little further. |
| 1500 | Insert and partially tighten MB screws. |
| 1515 | Matt exits lab |