Agenda
- Operations:
- Run 61 (HV#2) status
- Phonon collection efficiency update
- Some HV pulse data taken
- Finishing the run
- more HV data
- can we see the lower activation peaks?
- calculate Luke gain, verify detector bias
- assess data in hand for signs of deneutralization (took data overnight without flashing…)
- Characterize “breakdown”
- Request from Noah et al. to run at higher temperature, see if oscillation region changes
- Request from Bernard & Bill Page to try modifying prebiasing protocol, take noise data
- Request from Anthony to try more PuBe neutron data. Have avoided this so far in order to not deal with elevated event rates
- Run timing
- Si HV may arrive as early as Friday
- UPDATE: Matt Cherry having difficulty with wirebonding, won't ship until next week
- Plan was to finish data this week, warm up over weekend
- Should we push the run a little longer?
- Next run, Run 62: HV#4
- first Si HV prototype. Mask and TES properties will be the same as G101c
- wirebonded to access all 12 channels
- comes with two LEDs
- how to calibrate? can we get a bare Am source? otherwise will have to make due with our Am sources
- Processing and Analysis
- Run 60, 6“ detector, analysis
- Geant sims
- Measuring capacitance
- Old items
- need to get back to work on NSOF, should test whether resolution is improved with new filtering
- Then work on reprocessing old data
- Physics
- Measuring low-energy comptons with 88Y, triggering with external detectors
- Low-energy NR peaks from neutron capture in Ge, external trigger
- DAQ and data pipe
- DAQ upgrade soon. Amy asked if we would be cold still next week to test new DAQ
- Old/continuing items:
- Data storage and backup:
- Need to copy Run 60 data to SLAC
- Need to clean up vuk1/vuk2 before they are retired. Need to ask Angie again when she will finish copying data
- Autoprocessing and data organization development:
- should work on implementing smart processing so that data with different configurations can be processed automatically
- should add more info to database, particularly for potential outside manpower