Agenda
- Operations:
- Run 57: G114 (the other iZIPv6), no internal source
- Future runs: SD crystal, 6“ crystals, sidewall source, G106a re-run with corrected HV
- Next run is SD crystal. Then default is 6”. Will want to do G106a soon.
- DAQ and data pipe
- Data storage and backup:
- SLAC storage is ready: /nfs/slac/g/supercdms/tf/umn/.
- Matt still needs to learn the fancy tools for data cataloging before starting to copy data over.
- Code education - Matt, Nick, David to learn more about DAQ and processing code (Anthony is the only expert)
- Processing and Analysis
- updates and planning
- What should we plan to publish?
- Physics
- Low-energy NR peaks from neutron capture in Ge