Agenda
- Operations:
- Run 57 has begun: G114 (the other iZIPv6) for HV attempt, maybe other studies, no internal source
- Note from Paul B: this is the first AJA detector, and there are some concerns re “step coverage” and continuity. If Rn's are found to be too high (say, >1.5 Ω) then we should probably immediately deem this detector “bad” in terms of phonons at least. Could still try to test HV characteristics with charge only.
- Bad SQUET replaced, one more stripline wire break, wire rerouted
- Future runs: SD crystal, 6“ crystals, sidewall source, G106a with no-internal-source
- need to mount and wirebond “USD1”
- need to learn more about the purpose of the sidewall source detector, aka G55
- DAQ and data pipe
- Data storage and backup - progress
- Code education - Matt, Nick, David to learn more about DAQ and processing code (Anthony is the only expert)
- Analysis
- cdmsbats audit for data analysis push (Anthony, pdf)
- updates and planning
- What should we plan to publish?