Agenda
- Operations:
- Run 56 (the current run): Run 56 Summary
- update on photoneutron (Y-Be) data
- switchable pi-filter boards have arrived. Should we start testing them now?
- finishing run: mu-metal shield tests, data with no lead/poly shield
- Next run: probably G114 (the other iZIPv6) for HV attempt, maybe other studies, no internal source
- Future runs: 6“ crystals, SD crystal, sidewall source, G106a with no-internal-source
- DAQ and data pipe:
- Description of triggering used for photoneutron data pdf
- Analysis: updates and planning
- 150 mm Si designs
- We need to decide on LED's to push electrode design forward
- LED spreadsheet with many options here.
- PDI-E940 currently used (will be needed for 1” thick crystal), very small, but might be difficult to attach. Very cheap.
- PDI-E801 has some differences from E940, but has wider emission angle (80% compared to 10%) and will likely be easier to attach. More expensive.