Fridge Status :
Swapped Xendstop pin to Pin4 and rechecked all electrical connections.
Installed tower in Fridge and staged for source mover test.
Installed camera to record source movement while making moves.
-
Source mover room temperature readings done.
-
Turbo pump: Undo the screws to open up the leaky connection.
-
-
Vacuum grease is applied and connect it back. Will do another check today to see improvement.
DAQ:
Accelerometers:
Sten confirmed that SDU can be used for powering and reading the piezos.
Shubham will be away for quite a long time. Others need to test.
I plan to take one of the piezos with me to SNOLAB to test it with the SDU.
Computers: