Muon Telescope with 2" PMT

The muon telescope was built with a 2“ PMT R1332 as the middle (signal) PMT. 2” PMT 8575B was the top of the telescope, and 1“ PMT 18 was the bottom of the telescope. The total number of events was 16358 for a run that took 4.8 days.

Table 1: Information about Data Run
Date Number Events Run Time Top PMT (bias) Middle PMT (bias) Bottom PMT (bias) Data File
2014/05/22 16358 414592 s 8575B (-1700 V) R1332 (-2000 V) 18 (-1200 V) 20140522_muon-test.dat
Figure 1: Amplitude of the pulse from the middle PMT.

The sharp cut-off around 8.2 V suggests this was the full-scale; however, the full-scale was set to 16 V.

Figure 2: Area under the pulse of the middle PMT.

Based on the calculated of this post, the energy of the peak around 120 nVs should be 5.6 MeV.