| 1230 | Doing a partial warmup to diagnoze the issue. It can be a mixture not very clean issue (last contaminants ~ 100 mbar) or VT valve being wobbly issue. |
| | Close VT to stop circulation. |
| | VT is now fully closed, close V2 (Still pressure is rising, currently 1.5 mbar, Condenser pressure falling). Turn off 3He pump |
| | Open V5 to let mixture from Condenser side into Still side. |
| | Close 1K Pot needle valve |
| | Close 1K Pot speedivalve, V4a, 4He pump inlet valve. Turn off 4He pump. Close recovery valve to 4He pump outlet. NOTE: remember to open recovery valve when the pump is turned back on. |
| 1313 | Begin LHe transfer @ MB = 33.9% |
| 1355 | End LHe transfer @ MB = 91.9% |