2024/08/27 (Tuesday)

Previous Day

  • Lab in-personnel: Himangshu
Status Partial warmed up yesterday. Plan is to cooldown again and see if we can hold at base temperatures. MC(H35) = 6.12 K slowly going upwards.
1207 Pumped mixture back to dump
1237 Pumped contaminants from the cold trap 1 ~ 600 mbar
1238 Flow mixture into both sides of fridge
1249 Turn on 4He pump. Open Recovery valve to 4He pump. Pump out line to 1K pot (open V4a, close 1K pot speedivalve and slowly open the 4He-pump inlet valve).Close the 4He-pump inlet valve once done. Check pressure in 1K Pot (with V4a open, 4He pump inlet valve closed). 1K Pot = 100 mbar on G3.
1302 Pump out 1K Pot slowly, opening the 4He pump valve until it just starts to make noise, then opening it more when it becomes more quiet.
1304 Open 4He pump valve fully
1304 MC temp dropping very slowly. P2 = 60 mbar. Pumping on 1K pot shows P2 fluctuating around 1 mbar =⇒ ice in it. So, I have opened the needle valve enough that there is more LHe pumping and things can get cooled down
1305 MC(H35) = 4.7 K, cooling fast now
1305 Open 1K Pot needle valve → 45° (3x half a unit mark). 1K Pot (P2) → – K / 60 mbar
1320 MC(H35) = 3.27 K
1330 MC(H35) = 3.11 K, MC temp dropping linearly. G1/G2 = 360/350 mbar . 1K Pot(P2) = 60 mbar
1402 MC(H35) = 2.39and flat. G1/G2 = 156.5/151.7 mbar . 1K Pot(P2) = 60 mbar
1405 Close V5 and V9, leaving 140.0 mbar mixture in dump. Turn on 3He pump.
1406 Start circulation through Trap 1. V2 → base+mark 1. Condenser(G1) peaks at 280 mbar. MC(H35) → 2.02 K
1411 P2 shoot up, Turned 1K pot needle valve to 30 deg or so.
1414 V2 → base+mark3. Condenser(G1) peak at 400 mbar. MC(H35) → 1.47 K.
1417 V → completely open (more than 180 deg turned anticlockwise). Condenser(G1) remains flat at 400 mbar. MC(H35) → 1.38 K
We will open VT(earlier called V6) manual valve now. Keep it turning a few deg at a time and check that G1/G2 is not shooting up. When the MC temp drops, we know that it is opening as expected. P1 will also come in range.
1435 Keep turning VT till P1 is lower 1000 mTorr range.
1439 Open V6 to pull the rest of the mixture out of the dump into circulation. Then, close it after a minute.

Next Day