start › cdms › k100 › run_diary › 20230310

2023/03/10 (Friday)

Previous Day

* Lab in-personnel: Zach, Himangshu

1400 Wiki is down for now and MB is ~5%, might be a little too high to add exchange gas to the IVC and CVJ.
1400 Connect line from turbo to CVJ, pump out line with scroll pump until 0.1 mbar then switch to turbo pump, leave this pumping for now.
Pump mixture to dump
1406 Turn on 3He pump, open V6 to 13%, close V13A.
1409 G1 is lower (20 mbar) Open V6 to 20% then 30% then 100%
1414 MC temp cools a little bit
1425 P1 = 0.19 mbar. Close V1, condenser speedivalve, and still gate valve so that we are only pumping on the cold trap.
1430 P1 = 0.036 mbar. Stop pumping on the cold trap and resume pumping on the fridge. Close V12A+speedivalve and open V1, condenser speedivalve, and still gate valve.
1517 P1 = 0.016 mbar. Stop pumping mixture to dump. Close condenser speedivalve, still gate valve, V1, V3, then V6.
1524 V6 is fully closed. Close V9, leaving 708.6 mbar in the dump. Turn off 3He pump.
1543 Add a tube length of He exchange gas to the IVC (turbo and CVJ closed), MC begins cooling as expected
1547 MC = 4.31 K, IVC = 3 ubar, add another tube length of exchange gas. Now IVC = 22 ubar
1553 Add another tube length of exchange gas, now IVC = 34 ubar
1558 Add 3 more tube lengths of exchange gas, now IVC = 0.1 mbar, close IVC valves.
1601 Pump out line to CVJ
1610 Add 1 tube length of He exchange gas into the pump manifold (turbo, IVC, and CVJ closed) then let the exchange gas into the CVJ.
1612 He recovery meter starting to turn
Check bag level in He liquifiying room, was at around 90% with 1 pump on so turn on the 2nd pump
1617 CVJ = 0.14 mbar, MC temp rising
1644 CVJ = 0.03 mbar, recovery meter turning slowly.
1645 Add another tube length of He exchange gas directly into the CVJ, CVJ = 0.25 mbar