UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20181026

2018/10/26 (Friday)

Previous Day

status: Warming up. Mixture in dump. LN2 traps pumped out. 1K Pot needle valve open. 1 bar N2 in IVC.
1345 MC(Cernox) = 296.2 K (LabView).
1350 Close 1K Pot needle valve. Should have about 1 bar He in it.

Next Day