Agenda
- Operations:
- Run 61 (HV#2, Ge) finished on Dec 20
- Run 62 (HV#4, Si) status:
- Setup
- modified wirebonding on S101, 15/16 channels can be read out
- installed bare Am source (smoke detector source from Matt P)
- installed 4 external LEDs in addition to 2 internal ones
- Electrical checks OK apart from some leaks to chassis in charge-related lines
- No throughput at 77K, blockage. Will need to warm up to fix the blockage.
- Processing and Analysis
- Run 61, HV#2 (Ge)
- Project goals:
- Measure phonon collection efficiency
- Characterize noise and resolution
- Verify Luke gain
- Necessary tasks to achieve these goals:
- Complete IbIs studies to determine TES gains
- Other goals:
- Optimize processing and calibration
- Characterize fiducialization power
- Run 60, 6“ detector, analysis
- Old items
- need to get back to work on NSOF, should test whether resolution is improved with new filtering
- Then work on reprocessing old data
- Physics
- Measuring low-energy comptons with 88Y, triggering with external detectors
- Low-energy NR peaks from neutron capture in Ge, external trigger
- DAQ and data pipe
- DAQ upgrade - progress
- Old/continuing items:
- Data storage and backup:
- Need to copy Run 60 data to SLAC
- Need to clean up vuk1/vuk2 before they are retired. Need to ask Angie again when she will finish copying data
- Autoprocessing and data organization development:
- should work on implementing smart processing so that data with different configurations can be processed automatically
- should add more info to database, particularly for potential outside manpower