Agenda
- Operations:
- Run 59 (G106a) plan:
- second HV attempt
- phonon collection efficiency versus mu-metal shield height.
- more data for position reconstruction studies - multiple Am sources in different positions
- Possibly test DCRC RevD with adapter board from UCB.
- May want to study phonon noise more.
- Run 59 prep:
- side coax situation: now have four iZIP-tower position-1 side coaxes. Our only matched set of 3 or more
- stripline breaks:
- Break in the DIB3 stripline, which presents a problem with fitting two rerouting boards on SQUETS on adjacent faces
- may be able to run with all three rerouting boards, trying this
- other option is to swap out to new striplines
- plagued with breaks this run, four so far and more seem to be appearing
- Future runs:
- 6“ contact-free (aka vacuum interface)
- Only 5 weeks now until the Queen's visit, extend Run 59 (G106a) until then?
Sidewall source ?- Theoretically, Ge-iZIP prototype test in October.
- DAQ and data pipe
- Data storage and backup:
- Still need to back up Run 58 to SLAC
- Need to set up a system for copying incoming data
- Code education: should try to find time to continue studying this (Matt, David?, Nick?, Allison?)
- Processing and Analysis
- Run 58 (USD1): investigate lack of peaks, alternatives for studying charge collection efficiency
- Progress in NSOF development for reprocessing: Note
- What should we plan to publish?
- Physics
- Low-energy NR peaks from neutron capture in Ge
- testing DCRCs for external triggering (e.g. HPGe)