Agenda
- Operations:
- Run 58 cryogenic questions
- Very slow cooldown
- Tower base around 50 mK, circulation pressures low.
- Should try to assess mixture amounts this run
- Firsts this run: Soudan iT4 tower, USD1 detector, detector mounted by Matt. Don't know if any of this is relevant to cryo issues.
- 1K Pot keeps running low, need to tweak open needle valve frequently - worsening problem
- Run 58 data (USD1)
- no breakdown seen at DCRC voltages (-13 V to +13 V)
- taking voltage-scan data, also long runs to characterize deneutralization
- need to figure out how to configure processing for 4-Q data, soon
- would like to end this run next week
- Future runs:
- G106a, second HV attempt. Also phonon collection efficiency versus mu-metal shield height. Possibly test DCRC RevD with adapter board from UCB. May want to study phonon noise more.
- Queen's people visiting lab during collab meeting, would be good to be running G106a at that time
- 6“ contact-free (aka vacuum interface)
Sidewall source ?- Current project schedule has GeHV prototype test at UMN starting September. Then UMN becomes very busy with project tasks. (All rather hypothetical IMO. Presentation at SLAC workshop)
- Looks like some tension in the calendar, need to look at this closely
- DAQ and data pipe
- Data storage and backup:
- Copying old raw data (runs 53-56) to SLAC now. Procedures.
52%64% finished. - Need to set up a system for copying incoming data
- Code education - Matt, Nick, David to learn more about DAQ and processing code (Anthony is the only expert)
- Processing and Analysis
- updates and planning - OF Templates Update
- What should we plan to publish?
- Physics
- Low-energy NR peaks from neutron capture in Ge