−Table of Contents
Muon Telescope tests with no Sample
The muon telescope was constructed with out the middle PMT and sample scintillator. 1“ PMT 18 was the top PMT and connected to channel 3 of the oscilloscope. 2” PMT 8575B was the bottom PMT and connected to channel 4 of the oscilloscope. The run was done in the new dark room in PAN for a total of 18947 events, which took about 4 days to run.
| Table 1: Summary of Data Files | |||||
|---|---|---|---|---|---|
| Date | Number of Events | Total Run Time | Bottom PMT (bias) | Top PMT (bias) | Data File |
| 2014/06/06 | 18947 | 264019 s | 18 (-1200 V) | 8575B (-1700V) | 20140606_muon-test_2ch.dat |
Typical pulses for each PMT
The pulses shown in Figures 1 and 2 are from the same event number and represent a typical pulse for each PMT. The pulses on channel 3 (PMT 18) are typically about 1/10 the size of the pulses on channel 4 (PMT 8575B).
Pulse area spectra
The difference in typical pulse height is also clearly seen in the comparison of pulse areas in Figures 3, 4, and 5. The expected muon peak does seem visible for both PMTs, shown in the close-up spectra in Figures 3 and 4; however, they occur at very different pulse areas.