UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20250707

2025/07/07 (Monday)

Previous Day

  • Lab in-personnel: Himangshu
Status 1K needle valve found leaky.
Testing 1K pot leak. Pump out 1K pot with needle valve closed, Main Bath at atm.
Check pressure in the lines with 1K pot speedivalve closed
Check pressure in the 1K pot with speedivalve open. Starting with 10e-1 mbar as starting point
Time Pressure (mbar)
22 sec 2e-1
2 min 23 sec 4e-1
6 min 5 sec 6e-1
10 min 27 sec 8e-1
13 min 56 sec 1

Next Day