2024/09/12 (Thursday)
- Lab in-personnel: Himangshu
| Status | MC temp went to base but slowly going up. |
|---|---|
| 1507 | MC(H35) = 63 mK, Still = 1.12 K, Coldplate = 156 mK |
| 1248 | Started LHe transfer, MB=4%, G1/G2 = 250/248 mbar |
| During transfer, G1/G2 = 200/200 mbar | |
| End Transfer, MB = 92.1%, G1/G2 = 250/250 mbar |