  • Lab in-personnel: Himangshu
Status Mixture in fridge with 3He pump off, 4He pump off
1251 Fill LN2 cold trap bath from 5L dewar.
1256 MC(Cernox)/Sorb/1K Pot = 4.75/–/–, G1/G2 = 455/445 mbar, MB = 71.7%
1257 Turbo on IVC = 86 nbar. With Turbo valve out for 1 minute IVC = 100 nbar
– P2 is up again after Himangshu pumped out the 1kpot on saturday, need to swap back to the scroll pump and redo it
1300 Pump out line leading to 1K Pot with scroll pump (V4a open, V1a closed, 1kpot speedivalve closed). Then switch the line over to the 4He pump. Turn on 4He pump and make sure the pump exhaust is connected to recovery and open valve to recovery lines.
1307 Check pressure in 1K Pot by opening the 1kpot speedivalve with V4a closed: Mechanical gauge = 300 mbar on G3.
1311 Pump out 1K Pot by slowly opening V4a then the manual valve at the 4He pump until it just starts to make noise, once it quiets down somewhat open it up a little more. continue this until the valve is fully open.
Leaving mixture in the fridge when starting 1K pot. P2 = 1 mbar
1315 Open 1K Pot needle valve → 15° (half the unit on the needle marks). 1K Pot → – K / 10 mbar.
Temp dropping slightly, MC(cernox) = 4.7 K
1324 Open 1K Pot needle valve → 30°. 1K Pot → – K / 25 mbar.
1325 Temps start to drop, mixture pressure starts to drop
1326 MC(H35) temp drops, flattens at around 3.2 K
1331 We will keep 1K pot needle valve at close to 30 deg since P2 is already ~ 30 mbar(we try to keep it in this range in earlier runs)
1338 MC(Cernox)/Sorb/MC(H35) = 2.68/–/2.60, 1K Pot = – K / 30 mbar. G1 (fridge+dump) = 200 mbar.
1350 MC(Cernox)/Sorb/MC(H35) = 2.15/–/2.09, 1K Pot = – K / 15 mbar. G1 (fridge+dump) = 60 mbar.
1350 Close V5 and V9, leaving 60 mbar in the dump. Turn on 3He pump.
1356 Start circulation through Trap 1. V2 → Mark 1+ mark2. Condenser(G1) peaks at 150 mbar. P2 jumps to 40 mbar before falling again. MC(H35) → 1.76 K. Still(P1) → 1.78 K / max mbar.
1406 V2 → mark 3. Condenser(G1) peaks at 160 mbar. MC(H35) → 1.44 K. Still(P1) → 1.47 K / max mbar.
1413 V2 → mark 4. Condenser(G1) peaks at 160 mbar. MC(H35) → 1.15 K. Still(P1) → 1.25 K / max mbar. P2 rise to 60 mbar and then came back to 10 mbar
1425 Made two full turns slowly while keeping G2 and P2 stable but no lower temp. MC temp seems to be going up again after 1.168 K
1450 After slowly opening VT(earlier called V6) and keeping an eye on G2, MC started showing more cooling at a point. VT(earlier called V6) must be ~12% at this point. Condenser(G1) peaks at 200 mbar. MC(H35) → 0.86 K. Still(P1) → 1.14 K / – mbar.
P2 is not sensitive at this point so we can just monitor G1 while opening the VT valve
1511 VT might be fully open → 100.%. Condenser(G1) peaks at 200 mbar. MC(H35) → 0.070 K. Still(P1) → 1.14 K / 400 mTorr.
1516 Open V6 to let the remaining mix out of the dump and into circulation. P1(Still) didnt peak. MC(H35) didnt peak. Condenser didnt peak.
1517 close V6
1519 Tower(U28)/MC(H35)/Coldplate = 117/41/153 mK, Still(P1) = – / 300 mTorr / 0 mW, G1/G2 = 140/100 mbar, 1K Pot(P2) = 30° / – K / 32 mbar, MB = 68%