2024/07/25 (Thursday)
- Lab in-personnel: Himangshu,Zach
| Status | Run 81 beginning, LN2 transfer day before yesterday, mixture in fridge |
|---|---|
| 1219 | MC(Cernox) = 77.41 K, Sorb = – K, G2/G1/P1 (circulation) = 510/490/(maxout) mbar |
| 1220 | IVC = 2.2 mbar, Start pumping out IVC with Scroll Pump. When pressure falls below 0.1 mbar switch to Turbo Pump. |
| — | Not yet filled LN2 cold trap dewar |
| 1231 | Take electrical checks on the three cables |
| 1217 | Turn on 3He pump and open V2 to 180+ deg, reestablishing circulation like yesterday. G2/G1/P1 → 590/600/0.5 mbar and settle |
| 1253 | Close V3 for 2 minutes to assess throughput. G1 falls at ~50 mbar/min. Reopen V3 |
| 1254 | Pump mixture to dump. Close V8, open V5 slightly (V9 already open), open V2 more in steps up to 30% |
| 1258 | G1 = ~0 mbar. Stop pumping mixture to dump. Close V3, close V1, close V5, close V2 |
| 1300 | V2 is fully closed, close V9, leaving 620 mbar in the dump. Leave 3He pump on. |
| Throughput test procedure, Cold Trap 1: |
- All mixture in dump, LN2 trap 1 is cold, condenser & still valves open (3He pump on - optional)
- Open V9, V8, V3, V5. Wait for G1 to be close to G2 (within 100 mbar).
- Close V3 and V5, open V1
- monitor G1
| 1310 | Perform mixture throughput test at MC = 77 K using above procedure with 3He pump on. Let G1 rise to ~500 mbar before Step 3, then it falls to ~50 mbar, then rises. Throughput = ~40 mbar/min. |
|---|---|
| 1313 | Open mixture to both sides of the fridge (V5) and cold LN2 Trap 1 (V3). |
| 1315 | Turbo on IVC = 16 nbar, with the turbo valved out for a min, IVC = 190 nbar |
| 1322 | Pump IVC with Leak Detector, Turbo valved out, IVC = 660 pbarL/s after a min |
| 1343 | Begin blowing out LN2 (following Blow Out Liquid Nitrogen). Main bath → 3 psi |
| 1345 | IVC = 600 pbarL/s, MB = 3 psi |
| 1400 | IVC = 547 pbarL/s, MB = 2 psi |
| Increase pressure from helium cylinder, pressure drops to 1 psi, seems the blowout is done | |
| 1409 | LN2 blowout is complete. Close V2A, V5A, V4A, and V1A. Close the He gas supply and the valve on the gas line. |
| Wait for the rubber hose to warm up to remove the tubing from the transfer stick, and then plug the transfer stick. Now you will check to see if the MB is empty. You are going to pump on the MB with the scroll pump. | |
| 1412 | IVC = 7,580 pbarL/s, something in the last 10 minutes caused it to rise, guessing around 1402 |
| 1420 | Start pumping out main bath with scroll pump. Open V4A and V1A and slowly open the scroll pump valve. |
| IVC is going down now, we must have a leak, best guess is at the ivc cap since the seal was not replaced since last warmup | |
| 1426 | P2 started lowering from maxed out value. |
| 1426 | IVC = 1000 pbarL/s |
| 1430 | P2 = 3 mbar, due to high resistance bellows we think this is as low as we can go |
| We need to warm up since there is a leak | |
| 1432 | Switch back to turbo pump on IVC, turn off leak checker |
| 1435 | Pump mixture back to the dump |
| First pump on everything, then pump on fridge only (isolate cold trap), then close fridge and pump on cold trap only, get P1 < 100 mTorr | |
| 1456 | Fill main bath to 1atm with helium (also accidentally let some air in by removing rubber stopper) |
| 1500 | Add 10 mbar of N2 exchange gas to the IVC |
| 1154 | Electrical check of ZC-70+interposer after connecting to Stripline 41 on Tower Face 5 with Cable 2 | ||||
|---|---|---|---|---|---|
| Detector: | S104 | Stripline | 41 | ||
| SC: | none | 77 K | |||
| Face: | 5 | Date | 07/25/2024 | ||
| SQUET: | ZC-70 | Cable | 2 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | - | OK |
| SQUID bias B/Ret | 19 | 34 | 1.69 k | OK | |
| SQUID bias C/Ret | 8 | 24 | 1.76 k | OK | |
| SQUID bias D/Ret | 23 | 39 | 1.99 k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | - k | OK |
| Feedback B/Ret | 2 | 18 | 9.18 k | OK | |
| Feedback C/Ret | 41 | 25 | 13.8 k | OK | |
| Feedback D/Ret | 22 | 6 | 16.92 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | OL,117,OL, OL, OL | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 48, 48, OL, OL | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 54, 64, OL, OL | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 46, 46, OL, OL | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | open | |
| QET A/QET C | 3 | 7 | |||
| QET A/QET D | 3 | 38 | open | ||
| QET B/QET C | 35 | 7 | open | ||
| QET B/QET D | 35 | 38 | open | ||
| QET C/QET D | 7 | 38 | open | ||
| open | |||||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | - | |
| LED 2 | chassis | 26 | - | ||
| Motor Coil X1 | 80 | ||||
| Motor Coil X2 | 99 | ||||
| Motor Coil Y1 | 125 | ||||
| Motor Coil Y2 | 85 | ||||
| 1204 | Electrical check of ZC-39 after connecting to Stripline 48 on Tower Face 3 on Cable 1 | ||||
|---|---|---|---|---|---|
| Detector: | S104 | Stripline | 43 | ||
| SC: | none | 77 K | |||
| Face: | 2 | Date | 07/25/2024 | ||
| SQUET: | ZC-39 | Cable | 1 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 1.5 k | OK |
| SQUID bias B/Ret | 19 | 34 | 1.37 k | OK | |
| SQUID bias C/Ret | 8 | 24 | 1.76 k | OK | |
| SQUID bias D/Ret | 23 | 39 | 1.37 k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 11.01 k | OK |
| Feedback B/Ret | 2 | 18 | 10.9 k | OK | |
| Feedback C/Ret | 41 | 25 | 10.1 k | OK | |
| Feedback D/Ret | 22 | 6 | 10.9 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 132, 39, 32, 33, 50 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 36, 37, 71, 37 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 50, 40, 25, 132(fluctuating) | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | –, –, –, – | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | open | |
| QET A/QET C | 3 | 7 | open | ||
| QET A/QET D | 3 | 38 | open | ||
| QET B/QET C | 35 | 7 | open | ||
| QET B/QET D | 35 | 38 | open | ||
| QET C/QET D | 7 | 38 | open | ||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | - | |
| LED 2 | chassis | 26 | - | ||
| 1211 | Electrical check of ZC-13 after connecting to Stripline 43 on Tower Face 2 on Cable 3 | ||||
|---|---|---|---|---|---|
| Detector: | S104 | Stripline | 48 | ||
| SC: | none | 77 K | |||
| Face: | 3 | Date | 07/25/2024 | ||
| SQUET: | ZC-13 | Cable | 3 | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 1.729 k | OK |
| SQUID bias B/Ret | 19 | 34 | 2.0 k | OK | |
| SQUID bias C/Ret | 8 | 24 | — k | OK | |
| SQUID bias D/Ret | 23 | 39 | 1.889 k | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 7.45 k | OK |
| Feedback B/Ret | 2 | 18 | 7.98 k | OK | |
| Feedback C/Ret | 41 | 25 | – k | OK | |
| Feedback D/Ret | 22 | 6 | 8.39 k | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 144, 44, 38, 38, 48 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 45, 45, 96, 45 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 48, 44, 28, 36 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 68, 38, 37, 37 | OK | |
| QET A/QET B | 3 | 35 | 1000-3000 | open | |
| QET A/QET C | 3 | 7 | open | ||
| QET A/QET D | 3 | 38 | open | ||
| QET B/QET C | 35 | 7 | open | ||
| QET B/QET D | 35 | 38 | open | ||
| QET C/QET D | 7 | 38 | open | ||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | - | |
| LED 2 | chassis | 26 | - | ||
Next Day