UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20240425

2024/04/25 (Thursday)

Previous Day

  • Lab in-personnel: Himangshu
Status Run 80 ongoing
1130 Refilled cold trap 1 from LN2 dewar
1135 Lhe transfer. Vent out. MB=94%
Connecting Cable 1 and Cable 3 to DCRC1 and DCRC3 (DCRC5 as dummy) directly, without the HV box. Take IbIs data
Map: Cable 1 → DCRC1 pA: Side2pC, pB: Side2pF , pC: Side1, pD: Side1
Map: Cable 3 → DCRC3 pA: Side2pE, pB: Side2pA, pD: Side2pD

Next Day