2024/04/25 (Thursday)
- Lab in-personnel: Himangshu
| Status | Run 80 ongoing |
|---|---|
| 1130 | Refilled cold trap 1 from LN2 dewar |
| 1135 | Lhe transfer. Vent out. MB=94% |
| Connecting Cable 1 and Cable 3 to DCRC1 and DCRC3 (DCRC5 as dummy) directly, without the HV box. Take IbIs data | |
| Map: Cable 1 → DCRC1 pA: Side2pC, pB: Side2pF , pC: Side1, pD: Side1 | |
| Map: Cable 3 → DCRC3 pA: Side2pE, pB: Side2pA, pD: Side2pD |
Next Day