UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20230216

2023/02/16 (Thursday)

Previous Day

* Lab in-personnel: Zach, Ping

Status Run 77 in progress.
Setup To Be Cable 2/1/3 → diverter/nothing/nothing → DCRC50(3)/DCRC55(1)/DCRCX(4)
1100 MC(H35) = 5.56 K, G1/G2 = 543/489 mbar, MB = -0.7%
Begin another cooldown
1145 Begin LHe transfer @ MB = -1.0%
1152 Turn on 4He pump. Open Recovery valve to 4He pump. Pump out line to 1K pot (open V4a, close 1K pot speedivalve and slowly open the 4He-pump inlet valve).Close the 4He-pump inlet valve once done. Check pressure in 1K Pot (with V4a open, 4He pump inlet valve closed). 1K Pot = 0.25 bar (-22.5 inHg) on mechanical gauge.
1205 Pump out 1K Pot slowly, opening the 4He pump valve until it just starts to make noise, then opening it more when it becomes more quiet.
1206 Open 4He pump valve fully
1208 MC(H35) = 5.48 K, cooling slowly. 1K Pot = 3.3 K / 1.2 mbar
1209 Turbo on IVC = 1 nbar, after being valved out for 1 min IVC = 6.3 nbar, open turbo again and close valves to IVC
1213 Open 1K Pot needle valve → 15° (half a unit mark). 1K Pot (P2) → 2.75 K / 9.0 mbar
1219 MC temp dropping
1220 Open 1K Pot needle valve → 30°. 1K Pot → 2.20 K / 26 mbar.
1234 Ended LHe transfer @ MB = 93.8%
1243 MC(H35)/1Kpot = 2.47/1.62 K, MC temp dropping linearly. G1/G2 = 115/123 mbar . 1K Pot(P2) = 20 mbar.
1248 Fill LN2 cold trap dewar
1251 P2 at 11 mbar now, open 1K Pot needle valve → 37.5°. 1K Pot → 1.58 K / 13 mbar.
1255 P2 at 11 mbar again, open 1K Pot needle valve → 45°. 1K Pot → 1.57 K / 13 mbar.
MC temp is settling around the He transition point (2.17K) maybe this is why P2 goes often goes low at this point
1300 MC(H35)/1Kpot = 2.14/1.56 K and flat. G1/G2 = 58.9/51.8 mbar . 1K Pot(P2) = 11 mbar.
1301 Close V3 and V9, leaving 51.4 mbar mixture in dump.
1302 Turn on 3He pump
1304 Start circulation through Trap 1. V6 → 12.6%. Condenser(G1) peaks at 372 mbar. MC(H35) → 1.65 K. Still → 1.64 K / 55 mbar. P2 jumped up over 100 then fell to 50 mbar
1308 Close 1K Pot needle valve → 30°. 1K Pot → 1.62 K / 20 mbar.
1311 V6 → 13.0%. Condenser(G1) peaks at 231 mbar. MC(H35) → 1.23 K. Still(P1) → 1.26 K / 5.0 mbar.
1314 V6 → 13.4%. Condenser(G1) peaks at 188 mbar. MC(H35) → 1.14 K. Still(P1) → 1.16 K / 2.8 mbar.
1317 V6 → 13.8%. Condenser(G1) peaks at 179 mbar. MC(H35) → 1.08 K. Still(P1) → 1.12 K / 1.9 mbar.
1322 V6 → 14.4%. Condenser(G1) peaks at 190 mbar. MC(H35) → 0.81 K. Still(P1) → 1.10 K / 1.1 mbar.
1326 V6 → 15.0%. Condenser(G1) peaks at 192 mbar. MC(H35) → 0.57 K. Still(P1) → 1.11 K / 0.7 mbar.
1330 V6 → 100.%. Condenser(G1) peaks at 197 mbar. MC(H35) → 0.34 K. Still(P1) → 1.05 K / 0.2 mbar.
1402 MC(H35) = 35.5 mK and pretty flat, G1 = 125.4 mbar and pretty flat. 1K Pot = 1.63 K / 24 mbar.
1403 Open V14 to pull the rest of the mixture out of the dump into circulation.
1404 MC(H35) rises to 94 mK, Still maxes out at 1000 then falls again, Condenser(G1) rises to 220 mbar. 1K Pot unaffected.
1408 MC(H35) rises further to 111 mK, then falls
1409 Plug in DCRCs
1427 P1 = 0.85 mbar (<1), close V14
From IbIs with MC = 30 mK
SQUET Cable DCRC channel Detector channel SQUID Bias SQUID Lockpoint QET bias @ dP/dI = - uV Previous Run
ZC-74 1 DCRC1pC Side1pC -92.6 -3.98 no transition(feedback resistance low) 235
ZC-74 1 DCRC1pD Side1pF -97.9 -2.4 148 274
ZC-31 2 DCRC3pA Side1pE -98.1 -6.12 135 246
ZC-31 2 DCRC3pB Side1pB -87.6 -3.49 190 225
ZC-31 2 DCRC3pC Side1pD -44.4 -2.86 no transition 258
ZC-26 3 DCRC4pC Side1pA -83.7 -7 320 212
ZC-74 1 DCRC1pA Side2pC -95(copy) -2.5(copy) no transition
ZC-74 1 DCRC1pB Side2pF -100 -2.01 no transition
ZC-31 2 DCRC3pD Side2pE -89.1 -3.81 no transition
ZC-26 3 DCRC4pA Side2pB -83(copy) -5.91(copy) no response to change in QETbias
ZC-26 3 DCRC4pB Side2pA -83(copy) -5.91(copy) no response to change in QETbias
ZC-26 3 DCRC4pD Side2pD -93.1 1.56 no transition
2205 DCRC4 is not responding in any channels, needs power cycling

Next Day