1210 Fill LN2 cold trap full
1500 G1=1.3 mbar, P1=22 ubar, and G2=5.2 mbar. Let in gas to G1 and P1. G1 rises to 807 mbar and P1 rises to 1000 mbar. Close V3 and pump out G1 until it reads 0 mbar. Close V2, V7, and open V1. Measure throughput rate to be 8 mbar/min.
1745 Isolate fridge lines and close all valves on IGH, ie. stop evacuating circulation lines with turbo pump.
Fill N2 cold trap full.
1830 Filled circulation lines with helium gas from nitrogen cold trap 1 through condenser line and fridge until gate valve. Opened gate valve and monitored pressure rise in P1. Initial rapid rise to 1.2 mbar, slowing down then speeding up again:
Time [min] P1 Pressure [mbar] Rate [mbar/min]
0 1.2 ± 0.1
1 3.0 ± 0.1 1.8 ± 0.1
2 4.5 ± 0.25 1.5 ± 0.3
3 5.5 ± 0.25 1.0 ± 0.4
4 7.0 ± 0.25 1.5 ± 0.4
5 10 ± 0.5 3.0 ± 0.6
6 15 ± 0.5 5.0 ± 0.7
7 20 ± 1 5.0 ± 1.1
8 28 ± 1 8.0 ± 1.4
9 36 ± 1 8.0 ± 1.4
10 40 ± 2.5 14 ± 3
11 60 ± 2.5 20 ± 4
12 120 ± 5 60 ± 6
13 300 ± 10 180 ± 11
1835 Evacuate circulation lines with scroll pump.
1910 Let in gas to G1 and P1. G1 rises to 999.9 mbar and P1 rises to 1000 mbar. Close V3 and pump out G1 until it reads 0 mbar. Open V11A to pump down cold trap until G1<5 mbar. Close V11A and open V1, allowing He gas to flow from still to G1 and then be pumped out with scroll pump. Leave overnight.
1920 Pack up G106a, filling puck with 7.1 psi nitrogen gas. Include package of rubber bands in crate, with 7 rubber bands securing each eyehooks on bottom and 8 rubber bands securing the eyehooks on top.