| 0205 | Commence data acquisition: 1-hour flash followed by 30-minute cooldown. Acquire ionisation-only data in following order: -/+1 V; +/-1 V; -/+2 V; +/-2 V; -/+3 V; +/-3 V; -/+4 V; +/-4 V; -/+6 V; +/-6 V; -/+8 V; +/-8 V; -/+10 V; +/-10 V; -/+12 V; +/-12 V. OR trigger on charge channels at 40 ADC bins threshold. |
| 0215 | Fill N2 cold trap full. |
| 0235 | Place Ba-133 source back in safe. |
| 1345 | Fill LN2 cold trap full. |
| | Tc measurements finished. Pump mixture to dump and begin warm up process. |
| | Transition temperatures measured while cooling from normal resistance to superconducting. Temperatures listed below: |