UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20140610

2014/06/10

1020 Fill LN2 cold trap full.
1215 Finish locking SQUIDs on DIB 2 (DCRC 31) and DIB 3 (DCRC 50). Complete SQUID biases and Lockpoints for all three DIBs listed below for completeness:
DIB1 DCRC33 SQUID Bias [uA] Lockpoint [mV] Modulation Depth [Vpp]
A 82.03 4.38 .409
B 83.99 4.09 .436
C 82.04 4.67 .405
D 85.94 3.50 .420
DIB2 DCRC31
A 95.71 6.71 .464
B 89.85 4.28 .501
C 70.32 4.77 .474
D 83.99 3.31 .431
DIB3 DCRC50
A -76.17 -4.09 .319
B -64.46 -1.65 .277
C -78.12 -2.53 .321
D -80.08 -2.92 .351
1910 Place Ba source on dewar to aid in crystal neutralization.
Commence flashing crystal for 60 minutes followed by a 30 minute cool down.