UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20140607

2014/06/07

1445 Isolate IVC with 4.6E-6 mbar IVC pressure. Mixing chamber temperature at 5.1 K.
1500 Start 1 K Pot. Fill LN2 cold trap full.
1520 Start manual condensation. 665 mbar mixture initially in dump.
1540 With 315 mbar remaining in dump, close V9. Roughly 350 mbar outside of dump.
1550 Open V12A fully, G1 stabilized at 42 mbar, G2 stabilized at 40 mbar. Condensation complete. Open V6 to 12% to commence circulation procedure.
1734 Fill LN2 cold trap full.
2310 Fill LN2 coldtrap full. Mixing chamber thermometer at 63 mK. Tower thermometer at 180 mK.