| 1445 | Isolate IVC with 4.6E-6 mbar IVC pressure. Mixing chamber temperature at 5.1 K. |
| 1500 | Start 1 K Pot. Fill LN2 cold trap full. |
| 1520 | Start manual condensation. 665 mbar mixture initially in dump. |
| 1540 | With 315 mbar remaining in dump, close V9. Roughly 350 mbar outside of dump. |
| 1550 | Open V12A fully, G1 stabilized at 42 mbar, G2 stabilized at 40 mbar. Condensation complete. Open V6 to 12% to commence circulation procedure. |
| 1734 | Fill LN2 cold trap full. |
| 2310 | Fill LN2 coldtrap full. Mixing chamber thermometer at 63 mK. Tower thermometer at 180 mK. |