| 1025 | Begin pumping out He exchange gas from IVC. Mixing chamber temperature at 77.14 K. |
| 1100 | Fill LN2 cold trap full. |
| 1345 | Switch over to leak checker from turbo pump. Final IVC pressure at 2.2E-5 mbar. |
| 1350 | Commence LN2 blow out. Background leak rate of 5.3E-8 mbar*L/s. |
| 1500 | End LN2 blow out. Leak rate reached 4.2E-8 mbar*l/s. No indication of a leak. |
| 1530 | Pump out main bath. Add 0.22 mbar He exchange gas to IVC. |
| | Commence pumping mixture to dump. |
| 1545 | Flush the main bath with He gas. Pump out the 1K Pot. |
| 1550 | Perform 77 K electrical check. |
| 1630 | Commence LHe transfer (-1.0%). |
| 1750 | With mixing chamber temperature at 16 K, begin pumping out He exchange gas. |
| 1900 | End LHe transfer (69.4%). |
| 1920 | Fill LN2 coldtraps full. |