UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20140605

2014/06/05

1120 Fill LN2 cold trap full.
1220 Leak check IVC. Background leak rate of 2.0E-9 mbar*L/s rose to final leak rate of 2.1E-9 mbar*L/s. No gross leak indicated. Hopefully the indium has had enough time to flow.
1225 Raise dewar.
1300 Pump and flush main bath. Evacuate 1K pot.
1340 Add 4.6 mbar He exchange gas to IVC.
1350 Commence LN2 transfer.
1550 Finish LN2 transfer.
1620 Fill LN2 cold trap full.
1630 Commence cryocleaning mixture.
1650 Current mixing chamber temperature of 102K.