| 1045 | Fill LN2 cold trap full. |
| 1300 | Clean flanges and seal up. |
| 1400 | Begin pumping out IVC. |
| 1700 | IVC pressure at 6.8E-3 mbar. Begin leak check. Background leak rate of 1.9E-8 mbar*L/s. |
| 1715 | Final leak rate dropped to 1.7E-8 mbar*L/s. No leak detected. Proceed with raising dewar. |
| 1750 | Commence pumping out main bath. |
| 1820 | Fill main bath with Helium gas while monitoring leak rate of IVC. Spike in rate up to ~1.0E-3 mbar*L/s. Leak detected. Lower dewar to perform another leak test at bottom flange. |
| 1910 | Re-tighten bottom IVC flange and prepare for another leak check. |
| 1915 | Fill LN2 cold trap full. |
| 1920 | Background leak rate of 4.4E-8 mbar*L/s dropped to final leak rate of 4.2E-8 mbar*L/s. No leak detected. Leaving IVC to pump out overnight in hopes that indium will flow and fill in gaps that caused earlier leak. Current IVC pressure of 3.0E-3 mbar. |