2014/05/08
| 1040 | Fill LN2 coldtrap full. |
|---|---|
| 1705 | Commence LHe transfer (34.4%). |
| 1740 | Finish LHe transfer (91.6%). |
| 2130 | Mixing chamber temperature slightly high at 76.9 mK following transfer, but will hopefully calm down after long flash. Commence data acquisition. Six-hour flash followed by 2-hour cooldown. Eight 15-minute data series at -/+3.5 V bias, interspersed by a 6-second flash followed by 20-minute cooldown. OR trigger on phonon channels. |
| 2300 | Fill N2 cold trap full. |