2014/02/13
| 1030 | Filled LN2 cold trap full. |
|---|---|
| 1105 | Commence LHe transfer (6.3%). |
| 1210 | End LHe transfer (89.4%). |
| 2105 | Commence data acquisition for Q = -0.5 V, P = -0.5 V configuration (which failed last night). Initial flash for 4 hours followed by 2-hour cooldown. Acquisition/flash/cooldown = 5/0.1/20 minutes. |
| 2130 | Fill N2 cold trap full. |